Your Advantage |
What |
SANKALP Pre-Engineered Buildings (PEBs) |
Conventional Steel Buildings |
---|---|---|---|
[A]Your Time is always Convertible to Money. | Design | Quick and efficient; since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic designs are used over and over. | Slow: Each conventional steel structure is designed from scratch by the Consultant, with fewer design aids available to the Engineer!!! |
[B]No human error is possible. [C]Everything is Software driven. |
Design | Quick and efficient; since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic designs are used over and over. | Slow: Each conventional steel structure is designed from scratch by the Consultant, with fewer design aids available to the Engineer!!! |
[A]You can Start your Production / Utilization of Building Faster. | Delivery | Average 6 to 8 weeks. . Matches Your Speed of Growth in 21st Century | Average 10 to 15 weeks!!! |
[B]Calculate your Profits | Delivery | Average 6 to 8 weeks. . Matches Your Speed of Growth in 21st Century | Average 10 to 15 weeks!!! |